News dalla rete ITA

16 Giugno 2025

Arabia Saudita

KING SALMAN AIRPORT SETS JUNE DEADLINE FOR FOURTH RUNWAY

King Salman International Airport Development Company (KSIADC) has allowed firms until 17 June to bid for a design-and-build contract to develop the fourth runway at King Salman International airport (KSIA) in Riyadh. The tender was floated on 17 April. The previous bid submission deadline was 15 May. It is understood that the third and fourth runways will add to the two existing runways at Riyadh’s King Khalid International airport, which will eventually become part of KSIA. KSIADC, which is backed by Saudi Arabia’s Public Investment Fund, prequalified firms in September for the main engineering, procurement and construction packages; early and enabling works; specialist systems and integration; specialist systems, materials and equipment; engineering and design; professional services; health, safety, security, environment and wellbeing services; modular installation and prefabrication; local content; and environmental, social and governance and other services. The entire scheme is divided into eight assets. These are: Iconic Terminal Terminal 6 Private aviation terminal Central runway and temporary apron Hangars Landside transport Cargo buildings Real estate In August last year, KSIADC confirmed it had signed up several architectural and design firms for the various elements of the project. UK-based Foster+Partners will design the airport’s masterplan, including the terminals, six runways and a multi-asset real estate area. US-based engineering firm Jacobs will provide specialist consultancy services for the masterplan and the design of the new runways. UK-based engineering firm Mace was appointed as the project’s delivery partner, and local firm Nera was awarded the airspace design consultancy contract.   For registration as a supplier: https://www.pif.gov.sa/en/vendor-gate/ (ICE RIYADH)


Fonte notizia: Meed