Canada
CANDU ENERGY INC. RENEWS AGREEMENT WITH BRUCE POWER
Candu Energy Inc., an AtkinsRéalis company, has renewed a 10-year master services agreement (MSA) with Bruce Power — operator of eight CANDU® reactors at their Tiverton nuclear station that supplies Ontario with 30% of its power. The MSA runs until 2035 and, subject to future Bruce Power contracting awards, covers possible future scopes of work for AtkinsRéalis that could be worth up to $1 billion. This new long-term collaboration with Bruce Power replaces the previous MSA signed in 2015 between the same parties, which was set to expire at the end of this year.“The renewal of this MSA is a testament to the strength of our relationship with Bruce Power, and the confidence they place in our work as the steward of CANDU technology,” said Ian L. Edwards, President and Chief Executive Officer, AtkinsRéalis. “Our continued long-term support for their CANDU-powered station is critical to Ontario’s energy security and clean power goals. We look forward to many more years of collaboration together, building on the success of the prior MSA.”Developed collaboratively with Bruce Power, the renewed MSA spans Candu Energy Inc.’s entire scope of capabilities, for future packages of work not covered by its existing life extension contracts through the Shoreline Power Group joint venture. This includes all original equipment manufacturer services and innovation scopes that support the ongoing health and maintenance of the Bruce Power station, such as reactor core engineering, tooling and robotics, parts supply, nuclear safety and licensing, project management and controls, outages, reactor programs, and lifecycle management. (ICE TORONTO)
Fonte notizia: https://www.canadianmanufacturing.com/
